Wednesday, November 16, 2011

Screen House Going Up

The pool guys took down the cement forms around the pool and turned it over to the screen house guys.

The screen house guys are Cubans and Bob the Builder says they work to a different schedule and he was right, they don't show up until 1 or 2 and then work till 6 or 7 every afternoon. This is their work bench for cutting the Aluminum beams.

They quickly remove the outside wall of the Lanai and set up the beams for the walkway to the pool.

They assemble and partially screen all the wall sections while they are laying on the ground. Neat tool the guy is using - it has a roller on one end which he uses to push the spline in and the other end has a razor knife which he trims the screening with --Very fast.

They then pick them up and carry them over to the pool.

Where they bolt them to the deck and the last wall pannel.

This is the end of day 2 for the screen house guys

It looks like they are going to put up the roof beams next.

No comments:

Post a Comment